R1SK builds your risk register from the assessments you complete — one filterable list of hazards, residual scores, and controls that never needs rebuilding by hand.
See Data & AnalyticsEach row is a hazard from a completed assessment — with its location, residual rating, and the types of control keeping it in check.
Residual hazards across completed assessments.
| Ref | Hazard | Location | Residual | Controls |
|---|---|---|---|---|
| RA-0070 Lone Working – Site Security | Assault or medical emergency while working alone | Southern Site > Gatehouse | 16 · Very High | Administrative |
| RA-0057 Forklift Operations | Pedestrian struck by a moving forklift | Northern Depot > Warehouse | 12 · High | Engineering, Administrative |
| RA-0064 Hot Works – Pipe Repair | Fire from sparks near combustible materials | Northern Depot > Plant Room | 10 · Medium | Elimination, Administrative |
| RA-0061 COSHH – Cleaning Chemicals | Skin contact with corrosive cleaner | Head Office > Facilities | 6 · Medium | Substitution, PPE |
| RA-0042 Working at Height – Roof Maintenance | Fall from unprotected roof edge | Head Office > Building A > Roof Level | 5 · Low | Engineering, Administrative, PPE |
Every hazard on a live, completed assessment appears in the register with its residual score — nothing to copy into a spreadsheet.
Narrow the register by location, residual risk band, or control type to find where risk is concentrated.
Each row links to the assessment it came from, so reviewers can check the full context in one click.
Download the register as an Excel file for audits, board packs, and insurer or client requests.
Residual scores are banded using your organisation’s risk matrix, so the register speaks the same language as your safety policy.
See which hazards rely on elimination or engineering and which lean on administrative controls or PPE alone.
People limited to selected locations only see hazards for those sites, so one register serves the whole organisation safely.
Only live, completed assessments feed the register, so it reflects the controls actually in force today.
See how R1SK keeps your risk register current as assessments are completed and revised.